|
MS Publisher, Windows (basic), ISO 14001, MS Excel, Wifi, MS Outlook, AS 400, MS Explorer, MS PowerPoint, 3G - ms wod .NET 2G abcd, E-Mail, MS Access, Microsoft, Internet
|
|
Manufacturers of automotive coils : Team Manager From 2019-01 To Current Duties
- Responsible for 3 Plants – Leaf Springs, Suspension and Coil
- Direct supervision of 3 Plant Supervisors with a total staff compliment of 21
- Ensure production runs efficiently with a daily production target of 250 units per plant
- Liaison with the Planning Team daily to ensure correct resources
- Production reports daily
- Overseeing Laboratory Technicians to ensure Laboratory results come back timeously
- Checking of Laboratory results to ensure that components are in specification
- Working according to the ISO 9001 and ISO 14001 quality standards
- Working to QA (Ford) quality standards
- Attend daily production meetings with Plant Managers, Area Managers, Quality Manager, Maintenance Manager and a Process Engineer
- Trouble shooting on process problems
International automotive parts manufacturer in the world; : Production Control & Logistics Continuous Improvement (PC&L) From 2014-09 To 2018-12 Duties
- Working in the PC&L Department
- Supervision of 10 Warehouse Personnel
- Industrial relations: Unionised environment and acted as a complainant in disciplinary enquiries
- Ensure plant implementation of PC&L methods and tools
- Provide plant with PC&L standards: Material Information Flow analysis (MIFA), Milk run (scheduled the timing plan/time slots for deliveries), levelling etc. (working on the JIT system)
- Define PC& deployment objectives on a semi-annual basis and build up an action plan in co-operation with the plant and division PC&L Managers
- Set up the means to achieve the action plan and ensure results.
- Support management in the implementation of PC&L tools and provide technical support to other functions.
- Communicate improvement initiatives: train and coach plant employees when necessary and carry out progress workshops in accordance with the plant PC&L Manager.
- Training employees on the Faurecia Excellence System (FES) – this was Lean Manufacturing based
- Identify and implement best practices.
- Ensure Know-how capitalization and check that standard forms are used
- Project: Implemented a new truck utilisation programme called TEO which was also Lean Manufacturing based
- Working on the SAP system for warehousing (inbound and outbound) and packaging
Production Planner Jan 2016 - Aug 2017
- Supervision of 2 Planning Administrators
- Planning and preparing production schedules for manufacturing
- Expediting orders through the facility and implementing customer changes.
- Advising Planning Managers, Scheduling Manager and Customer Service Officers of changes in the schedule of orders.
- Preparing and maintaining all documentation related to an order from a scheduling point of view.
- Determine available capacity before planned orders are released.
- Maintain inventory levels and material availability.
- Maintain and update the MRP system.
- Integrate multiple schedules into a master project schedule.
- Develop and maintain summary level schedule reports.
- Analyse production floor status through input/output control reporting.
- Troubleshoot and monitor potential scheduling problems.
- Preparing analysis of main KPI’s (key performance indicators)
- Facilitate and participate in weekly schedule reviews.
- Change control management of design changes from the Development Team.
- Managing building in Memo’s and Engineering changes (and signing off)
- Working on the Baan system for MRP scheduling
Quality Engineer Sep 2014 - Dec 2015
- Supervision of 30 staff (Operators and 2 Quality Technicians)
- Implemented ISO 9001 procedures within the Plant, and ensure compliance with corporate policies and procedures.Manage the activities and the development of the Quality and Engineering Team
- Development and operation of quality control systems application and analysis of testing and inspection procedures.
- Evaluate the performance of the Quality and Engineering Team and manage the quality indicators
- Implement statistical methods to diagnose and correct improper quality control practices.
- Audit quality systems for deficiency identification and correction.
- Ensuring the quality of the product produced.
- Conduct corrective actions such as containment, replacement supplies, problem solving etc. on all customer complaints and non-conformances
- Manage FMEA (failure mode effect analysis), Control Plans and Work Instructions
- Develop and implement quality programmes, including tracking, analyzing, reporting and problem solving.
- Assist in defining/developing Quality Programme status indicators, performance measurements and reporting requirements.
- Implement improvement in manufacturing processes to increasing the productivity, quality and safety.
- Facilitate continuous improvement and learning across all functional areas through training and communication of quality initiatives.
- Attend Customer and internal quality complaints and guarantee the response through the 8D report.
- Obtain, monitor and evaluate customer and internal PPM (production plan monitoring) results by use of charts.
- Ensure effective implementation of actions to solve and prevent Quality non conformities.
- Control the environmental impact of the process to their surroundings.
- Manage Certificate of Conformance as per customer requirements
- Conduct 5S audits, Lean Evaluation/Assessment to monitor the improvement progress within the plant.
- Implement and maintain a Standard Production System in the facility
Leading Supplier of Eco-Friendly Face Brick & Clay Paving in SA. : Production Manager From 2012-01 To 2014-05 Duties
- Direct supervision of 3 Production Supervisors and a total staff compliment of `154
- Industrial relations – Unionised environment
- Chairing of disciplinary enquiries
- Performing performance appraisals on the 3 Production Supervisors
- Ensure a smooth and efficient production operation
- Ensure planned output levels, cost levels and quality objectives are met
- Understanding the interaction of the production process disciplines.
- Co-ordination and control of production
- Effective managing of organizations production
- Handling production change over
- Forecasting the requirements of the production in order to achieve the production target.
- Production target of 10 000 bricks per day
- Attending daily Production meetings with the Factory Manager, 3 Production Supervisors, Maintenance Manager, Quality Manager, Despatch Manager and the Making Department
- Working to the production plan
- Improve production systems
- Upholding quality standards.
- Improving the productivity level of the workers by adhering to standards of performance derived from work measurement studies
Previous Position Held
Lear Corporation- May 2010 – Dec 2011 In-service Trainee (Project Engineer) This was for her P1 and P2 in-service training Dissection of manuals (CAD files) of the actual seats and from this the manufacturing layout, material flow, manning and work instructions for seat assembly were processed
|