|
National Diploma - Industrial Engineering:Mathematics I, II Mechanical Manufacturing Engineering I, II Engineering Work Study I, II, III Production Engineering: Industrial I, II Quality Assurance I, II Facility Lay-out and Materials Handling II Mechanical Engineering Design II, III Industrial Accounting III Operational Research III Automation III Industrial Leadership III Experiential Training 1 & 2t Short Learning Programme - Financial Management:Introduction to Financial Management Financing & Investment Decisions Working Capital Management Risk Management B- Tech - Industrial Engineering:Logistics Engineering IV Project Engineering IV Quality Assurance IV System Dynamics IV Entrepreneurship IV Project Research IV Management Information Systems II 2015 - Registered Subject Production Technology IV PGD: Business Administration :Value Chain Management, Information systems, Accounting, Economics, Leadership
|
|
Railway : Supplier Delivery Performance Manager From 2015-08 To 2024-03 Duties
- Review supplier deliveries per project with applicable material planner.
- Delivery risk identification, escalation & mitigation plan development.
- Develop & manage supplier risk matrix to inform a view on critical suppliers.
- Engage the entire Australian supplier network on cyclical Supply Chain Audits.
- Execute Light to Full Supply chain audits with applicable suppliers.
- Execute supplier capacity simulations driven by Alstom demand per project.
- Develop, detail & monitor supplier specific action plans to address failed audits and identified capacity constraints.
- Guide & counsel material planning on supplier delivery risks to inform demand management/scheduling.
- Key liaison for all delivery improvement initiatives linked to external suppliers.
- Share recommendations at business award level to inform adjudication.
- Present & escalate key supplier risk findings for all Australian projects to Senior management
Project Supply Chain Leader Aug 2019 – Aug 2023
- Supply chain risk identification & mitigation strategy implementation
- Change configuration board representative for all supply chain topics
- Change management key liaison for supply chain
- Material Coverage consolidation, risk identification & management
- Oversee the definition & implementation of key policies within supply chain
- Facilitate all platforms on raw material management
- Identify & launch supply chain related improvement initiatives
- Key liaison for obsolescence management
- DFQ platform representative for supply chain
- Baseline application management at warehouse, methods & procurement level
- Resources definition & onboarding for motors scope
- Lead & manage all Supply Chain topics for motors project
Logistics Manager Jun 2017 – Aug 2019
- Oversee the movement, distribution & storage of inbound material
- Set up methods to address on time receipts, system entry & put away
- Draft & manage the implementation of an inventory cycle count plan
- Oversee material replenishment & packaging solution implementations to support manufacturing
- Set-up component delivery solutions for improved OTD to Gibela
- Oversee internal packing, storage & packaging proposals for components with Gibela
- Set up methods to address on time delivery, goods entry & replenishment
- Key facilitator for GSI related functions within the warehouse & shipping scopes
- Oversee the drafting & implementation of stock holding policies within the warehouse environment
- Manage capacity requirements planning for all logistics applicable platforms on site
- Material flow definition & logistics resource planning for all compo related workshops on site
- Value chain management for logistics applicable matters on site
- Lead contact for all logistics related key themes
- Define internal work/functional standards & requirements for logistics personnel
Senior Logistics Methods Engineer Aug 2015 – May 2017
- Define & compile packaging & logistics specifications as per commodity.
- Logistical footprint definition
- Interacting with relative stakeholders for process reviews & amendments for the purpose of streamlining.
- Supply strategy definition & implementation.
- Capacity requirements planning.
- Establishing, defining & communicating packaging requirements to supplier base.
- Cost reduction plans through evaluating current packaging types against market
- Packaging data handling from ILN (International Logistics Network).
- Warehouse capacity studies.
- Man assignment planning - to establish the number of pickers/binners to be used as per dedicated area as well as the work load.
- Warehouse storage strategy definition& implementation.
- Warehouse space analysis as based on material profiling & stock holding policy.
- Material storage database modeling
- Layout Design
- Line side feeding strategy definition & solution design
- Process mapping, definition & implementation.
- Material flow definition & resource planning
Contract Logistics and Distribution : Industrial Engineer From 2012-10 To 2015-08 Duties
- Liaise with warehouse managers & clients to implement process improvement plans for specified operations & facilities.
- Design, establish & implement solutions based concepts unique to client requirements & profile.
- Resource requirement planning - Identifying the types and the required number of material handling tools and machines.
- Design and implementation of material flows within the warehouse based on the pulling mechanism.
- Warehouse capacity studies with regard to space utilization, current infrastructure & manning plan.
- Material storage database modeling
- Layout Design
- Value stream mapping identified operations with the objective of isolating inherent constraints to further suggest corrective action.
- Running process simulations to highlight optimal elements & process to be implemented.
- Warehouse storage strategy definition & implementation.
- Warehouse space analysis as based on volumetric data & quantities.
- Data mining & manipulation using SAP table browser.
- ABC exercise definition, scoping, activity breakdown & implementation.
Steel and Mining Industry : Supply Chain Process Analyst From 2011-01 To 2011-12 Duties
- Design and establish process flows for specified supply chain operations.
- Establishing KPI’s & process tracking system.
- Liaising with service providers to implement improvement plans.
- Measurement and tracking of performance indicators for the procurement division.
- Scorecard Reporting.
- Sourcing specialization for logistics and cost analysis for inbound transportation to dedicated plants.
- Cost reduction plans through evaluating current packaging types against market Packaging data handling from ILN (International Logistics Network).
- Warehouse capacity studies with regard to space utilization and the packaging types to be stored in the specified buildings through calculating the packing dimensions.
- Man assignment planning - to establish the number of pickers/binners to be used as per dedicated area as well as the manning load.
Automotive - Motor Vehicles : Logistics and Material Handling Engineer From 2007-09 To 2010-12 Duties
Logistics and Material Handling Engineer May 2008 to December 2010
- Packaging & component quality investigations and analysis with the objective of reducing damage per component reports.
- Eliminating repackaging by changing packaging specifications and standard number of parts (Local and CKD parts)
- Systems establishment for carryover components from ILN source to local suppliers (localization).
- SAP Control Cycle data creation & maintenance.
- Liaising with Process Engineering to establish point of fitments for new project components.
- Logistics and Line supply Monozukuri establishment.
- Project coordinating new improvement & model launches from a logistics point of view. (Euro Export Models)
- New component deviation, carry over and adoption control at line side.
- Design and manage process work flow for sequence driven areas.
Warehouse Management
- Warehouse capacity studies with regard to space utilization and the packaging types to be stored in the specified buildings through calculating the packing dimensions.
- Man assignment planning - to establish the number of pickers/binners to be used as per dedicated area as well as the manning load.
- Resource requirement planning - Identifying the types and the required number of material handling tools and machines.
- Design and implementation of material flows within the warehouse based on the pulling mechanism.
- Routing of specified materials to dedicated bin types through the optimizing the warehouse layout and demarcating bin locations.
- Establishing inventory plans for both the local and CKD Warehouse to mitigate stock bottlenecks occurrences.
- Devanning planning and scheduling for decanting requested containers within the relevant warehouses.
- Demurrage cost reduction through age analysis and penalty cost calculations as per detained stock within the relevant shipping containers.
- Logistics cost analysis through optimizing container utilization through packaging changes and improvements.
Material Handling Technician Inbound Logistics - Body Shop February 2008 to April 2008
- To evaluate and reduce Supply Chain Logistics Costs.
- Establishing new point of fitments for incoming stock.
- SAP Data establishment and maintenance for new parts.
- Updating warehouse data with respect to new part views.
- Establishing packaging profile for specified components.
- New material layout & facilities design.
- Planning, establishing and maintaining supply strategies for relative stations and components
Material Handling Contractor X90 Project - Renault and Nissan joint project launch September 2007 to January 2008
- Establishing relative logistical component requirements & communicating them to 1st tier suppliers.
- Component & Logistics cost analysis.
- Liaising with service providers to clearly define supplier to consumer competency.
- Standard component quantity analysis for RFQ purposes (Request for quotation).
- Packaging usage investigations to establish standard packaging types to be used during supply of components.
- Packaging data handling from ILN (International Logistics Network).
- MPS analysis for capturing required quantity of specific packing types to be used in supplier loop.
|